- 2000 L.F. of bulkhead and waterfront promenade
- Heavy timber piers (3)
- Timber pedestrian bridge beneath draw bridge and road
- Constructed on old landfill site
- Heavy timber construction access piers
- Bulkhead and riprap toe protection
- Major CAMA permitting
- Storm water and erosion control permitting
- Initial phase of overall face lift and re-development of Union Point Park
- Provided permitting, design, and construction administration services