- 10 slips, floating docks with concrete guide piles
- Project was completed within the Client’s budget and on schedule in time for the first Morehead City In-Water Boat Show
- Dredging and disposal
- Fire protection – dry standpipe
- Engineer also provided assistance in grant preparation, project formulation, initial site planning and cost estimating
- Marine power systems
- BIG Grant and Town funding
- Provided permitting, design, and construction administration services
- Initial phase of overall face lift and re-development of Jaycee Park that is ongoing
- Dock space for side-to short term moorings for small boats visiting downtown waterfront
- Coordination of power and supply of potable water
- Major CAMA permitting