- 114 slips from 40 to 100 feet
- Floating docks with steel pipe guide and mooring piles
- Fire protection – dry standpipe
- 625 linear feet of tied back bulkhead, toe protection
- Floating wave attenuators on north and south exposures in Neuse River
- Waterfront promenade with decorative railings
- Provided engineering for breakwater design, and floating dock and breakwater procurement
- Fuel and sewer pumpout provided
- Bulkhead and riprap toe protection
- Storm water and erosion control permitting
- Provided permitting, design, and construction administration services
- Heavy Timber construction access piers
- Full marina utilities including power, water, WiFi and telephone
- Major CAMA permitting