Project Status
- Constructed and Operational – 1996 100%
Project Engineer: J.W. (Bill) Forman, Jr., P.E.
Project Highlights
2000 L.F. of bulkhead and waterfront promenade
Heavy timber piers (3)
Timber pedestrian bridge beneath draw bridge and road
Constructed on old landfill site
Heavy timber construction access piers
Bulkhead and riprap toe protection
Major CAMA permitting
Storm water and erosion control permitting
Initial phase of overall face lift and re-development of Union Point Park
Provided permitting, design, and construction administration services
Urban design by Allison Platt & Associates