Moss Landing Condominiums

Bridgeton Marina & Yacht Club

Bridgeton, North Carolina

The Client

Harborside 17, LLC – Tom Wynn, New Bern, NC

Project Status

Constructed and Operational – 2008

  • Constructed and Operational – 2008 100%

Project Engineer: J.W. (Bill) Forman, Jr., P.E.

114 slips from 40 to 100 feet

Floating docks with steel pipe guide and mooring piles

Waterfront promenade with decorative railings

Full marina utilities including power, water, WiFi and telephone

Project Highlights

N

114 slips from 40 to 100 feet

N

Floating docks with steel pipe guide and mooring piles

N

Fire protection – dry standpipe

N

625 linear feet of tied back bulkhead, toe protection

N

Floating wave attenuators on north and south exposures in Neuse River

N

Waterfront promenade with decorative railings

N

Provided engineering for breakwater design, and floating dock and breakwater procurement

N

Fuel and sewer pumpout provided

N

Bulkhead and riprap toe protection

N

Storm water and erosion control permitting

N

Provided permitting, design, and construction administration services

N

Heavy Timber construction access piers

N

Full marina utilities including power, water, WiFi and telephone

N

Major CAMA permitting