252.622.4338
The Boathouse at Front Street Village

The Boathouse at Front Street Village

Beaufort, North Carolina

The Client

Front Street Village, LLC
Bucky & Wendy Oliver, Beaufort, NC

Project Status

  • Phase 1 – Constructed and opened in summer 2010 100%
  • Phase 2 – Under construction 60%
  • Phase 3 – Started construction in 2015 20%

Project Engineer: J.W. (Bill) Forman, Jr., P.E.

785 L.F. of steel sheet pile bulkhead with concrete cap

Bulkhead and boat launching platform in Phase 1

Re-development of former menhaden fish products factory

Floating docks with concrete guide piles

Site work for multi-use hotel and waterfront restaurant

Dry storage marina, 2 buildings with over 400 dry slips

Project Highlights

N

Re-development of former menhaden fish products factory

N

Dry storage marina, 2 buildings with over 400 dry slips

N

Concrete boat launching platform, integrated with bulkhead

N

Bulkhead and boat launching platform in Phase 1

N

785 L.F. of steel sheet pile bulkhead with concrete cap

N

Floating docks with concrete guide piles

N

Site work for multi-use hotel and waterfront restaurant

N

Use of pervious pavers as a stormwater BMP

N

Site planning by Sears Design Group

N

Dredging and upland disposal

N

Required CAMA Major permitting and modifications

N

Storm water management with stormwater reuse

N

Realignment and widening location of Lennoxville Road

N

Relocation of Front Street intersection

N

Use of underground sand filters as stormwater BMP

N

Erosion control design and permitting

N

Extension of Town of Beaufort water distribution and sewer collection systems

N

Design of three lift stations and force main to Town of Beaufort wastewater treatment plant