Moss Landing Condominiums

Jaycee Park Boat Docks

Morehead City, North Carolina

The Client

Town of Morehead City and
DMCRA, David McCabe, Public Works Director

Project Status

  • 2007 – Constructed and Operational 100%

Project Engineer: J.W. (Bill) Forman, Jr., P.E.

Floating docks with concrete guide piles

We Rethought Everything

10 slips

Dock space for side-to short term moorings for small boats visiting downtown waterfront

Assisted in grant preparation, project formulation, initial site planning...

Initial phase of overall face lift and re-development of Jaycee Park that is ongoing

Project Highlights

N

10 slips, floating docks with concrete guide piles

N

Project was completed within the Client’s budget and on schedule in time for the first Morehead City In-Water Boat Show

N

Dredging and disposal

N

Fire protection – dry standpipe

N

Engineer also provided assistance in grant preparation, project formulation, initial site planning and cost estimating

N

Marine power systems

N

BIG Grant and Town funding

N

Provided permitting, design, and construction administration services

N

Initial phase of overall face lift and re-development of Jaycee Park that is ongoing

N

Dock space for side-to short term moorings for small boats visiting downtown waterfront

N

Coordination of power and supply of potable water

N

Major CAMA permitting